Pictures From Around the Layout

A Valley Yard bound train pulled by a Chessie SD40-2 and GP40-2 enters the tunnel at Hudson

A A/B set of PRR F7s wait for permission onto the single main at Penninsula

East end of Valley Yard with caboose tracks and engine facility visible

Several Generations of CVT Power sit at the Valley Yard Engine Facility

Another Shot of the Valley Engine Facility, Showing the Turntable.

Some of the industries in the town of Brewster, All the buildings in this photo are scratch built.

Same location as above Different view point.

A shot taken from the eastbound main of the Penninsula Power coal fired powerplant.